• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Jennifer Marohasy

Jennifer Marohasy

a forum for the discussion of issues concerning the natural environment

  • Home
  • About
  • Publications
  • Speaker
  • Blog
  • Temperatures
  • Coral Reefs
  • Contact
  • Subscribe

jennifer

Snowy Hydro Still in Denial: Ben Glover

December 22, 2010 By jennifer

SNOWY Hydro has denied playing a role in exacerbating this month’s devastating floods despite a leaked document which appears to show that the authority released almost 7000 megalitres from Eucumbene Dam on December 8 – causing water levels to rise to peaks of close to 10 metres downstream in the Murrumbidgee.

Any water release from Eucumbene, floods or no floods, has raised eyebrows among a number of farmers and politicians, specifically because it is just over 20 per cent full, and Riverina MP Michael McCormack has labelled it “a disgrace”.

“It’s totally ridiculous to think that any dam would be releasing water when it’s nowhere near its capacity,” Mr McCormack said. “It’s totally incomprehensible that this would happen.”

The document in question, obtained by The Daily Advertiser this week, maps the inflows and outflows from each of the major dams on December 8 and is known as an operational plan.

It was initially sourced from a Snowy Hydro staff member concerned with the disregard shown for communities downstream.

Snowy Hydro has since rejected the veracity of the document however, explaining that it was just a “forecast model”, which was changed so that the floods downstream could be mitigated for.

The company has refused however, to provide the actual operational plan for December 8, citing “commercial in confidence”.

Snowy Hydro’s role in the floods was last week called into question by a number of media outlets and on December 15, metropolitan newspapers reported Snowy Hydro CEO Terry Charlton’s claims that the authority had not released any water on December 8.

“What we did last week, because we anticipated the floods, is we stopped releasing anything on Wednesday,” Mr Charlton said.

“So we took as much as possible into storage to mitigate the floods.

“But by Thursday and Friday we didn’t have the capacity to store it because we were chockers.”
A spokesman for Snowy Hydro has this week maintained Mr Charlton’s defence.
“We’ve already commented on these assertions and we have nothing further to add to what was in the Sydney press last week,” the spokesman said.

Tumut mayor Trina Thomson lives near the river and very nearly had to evacuate her home during the peak of the floods. She has called for Snowy Hydro to make available any data that could paint a clearer picture as to why the floods got to the level they did.

“I’d appreciate some transparency considering we have a number of landholders impacted on by the recent flood,” Cr Thomson said. “I think there are some grey areas that have to be clarified.”

Member for Murrumbidgee Adrian Piccoli, Wagga MP Daryl Maguire and NSW Opposition spokeswoman for water Katrina Hodgkinson were also strong in their views that Snowy Hydro should release all relevant data, but the office of the NSW Water Minister, Phillip Costa, refused to buy into the debate, saying only that they “would not comment on hypotheticals”.

Instead they brushed the issue aside to be dealt with by the NSW Office of Water, which sent a generic statement.  “Snowy Hydro operates within the conditions of its operating licence
and the NSW Office of Water ensures compliance,” the statement said.

“In response to a recent five-year licence review, both Snowy Hydro and the NSW Office of Water have increased the amount of information on operations available on their websites.”

Update: This article is now available on the website of The Daily Advertiser: http://www.dailyadvertiser.com.au/news/local/news/general/snowy-hydro-under-fire-over-water-release/2032134.aspx 

**********

Ben Glover from The Daily Advertiser in Wagga Wagga is the only person to have asked me directly for a copy of the Operational Plan.   Staff at both The Australian and the Australian Financial Review are aware of the story, aware of the leaked document, but so far have not followed-up or indicated that if I sent them a copy of the Operational Plan they may be too busy to follow-up or are about to go on Christmas holidays and couldn’t study it until January 5.   Prolific commentator at this blog, Polyaulax, has not  followed-up by asking for a copy of the document by phone or email.

Filed Under: News, Opinion Tagged With: Floods, Murray River, Snowy Hydro

Market Research and Unhealthy Rivers: David Boyd

December 18, 2010 By jennifer

The market researchers/analysts tell me that you wont win a “counter-intuitive” argument. Because people have been conditioned by repetitive claims of a particular point of view, to forthrightly state the opposite is likely to be dismissed out of hand. So they advise coming at the issue in a more subtle or different way. Sorry,but I am just not built that way! I like to think that I seek after truth and get emotionally upset when I see claims that I regard as untruthful. I do understand that there are deep philosophical arguments about what is truth, but let’s keep it simple.

The debate about our inland rivers is a good example. It seems to me that the (conditioned) starting point for most commentators is that it is taken as a given that “our rivers are unhealthy and that this is due to taking too much water out of them”. The MDB Plan certainly starts from that accepted position. I think that both the lack of health and the excessive extraction claims, are untrue. (And this is where your counter-intuition is triggered and I’ve lost you!) But, please read on…

at David Boyd’s Blog

Filed Under: News, Opinion Tagged With: Drought, Floods, Murray River, Philosophy

The Whole Truth: Water Deliberately Dumped into Flooded Area

December 16, 2010 By jennifer

SNOWY Hydro chief executive, Terry Charlton, recently confirmed that water was dumped into the already flooded Murray-Darling Basin, but said the authority had little choice (The Australian, December 15, 2010, page 7).   A real time operational diagram, however, tells a very different story.

Last Wednesday, Snowy Hydro could have sent water into Eucumbene dam.  At only 20 percent it had a storage capacity of a whopping 4 cubic kilometres of water.

Instead, the water managers set the trans-mountain tunnels so water was flowing away from Lake Eucumbene at over 80 cubic metres per second (6,912 megalitres for Wednesday).

Water was filling Talbingo and forcing releases from Jounama pondage into the already spilling Blowering Dam, threatening the township of Tumut and adding to the crisis along the Murrumbidgee River.

As if this wasn’t enough, the real time operational diagram for Wednesday December 8, 2010, shows that this water, drawn from Eucumbene, was also being used by Murray electricity generators pushing even more water directly into the Murray Darling Basin.

“Mr Charlton was incorrect in saying that generation was only from inflows below Eucumbene last Wednesday, although they were large at the time,” a source told me this morning.

“Why weren’t Mr Charlton’s water managers pushing the water back for storage into Eucumbene from the Tumut system,” he asked.

Tumut River residents were issued with urgent evacuation orders last Thursday after the increase in outflows.

Desperate farmers phoned Snowy Hydro last week asking why flood waters were being sent west, rather than east to Lake Eucumbene, given this dam was less than half full, but their calls were ignored.

The Snowy Mountains Scheme was built for the storage and diversion of water with hydropower generation as a by product.

Current and past employees claim that the current board and management are now driven almost exclusively by money.

“The management are setting the business up for sale when the NSW government changes next year,” said one source. “They want the balance sheet to look as good as possible so [we] are generating [power] like mad, even when electricity prices are low and irrespective of downstream impacts.”

Filed Under: News, Opinion Tagged With: Floods, Murray River, Snowy Hydro

Government to Finally Act on Bureaucratic Flooding

December 15, 2010 By jennifer

FINALLY, last night, the NSW government agreed to change Snowy Hydro Licence conditions which required water to be released into the already swollen Murrumbidgee and Murray Rivers –exacerbating the current flood crisis.  

The article in today’s The Australian newspaper (page 7), indicating licence conditions will be changed, quotes Terry Charlton, CEO of Snowy Hydro, denying that recent flooding was exacerbated by licence conditions.

This comment from Mr Charlton is disingenuous, contradicts comment he made to me in a telephone conversation yesterday, and also comment he made to former employees of Snowy Hydro at a meeting in Cooma on November 25, 2010, that even though Blowering and Hume dams were spilling, Snowy Hydro still had to release water from Lake Eucumbene because of licence conditions.

Filed Under: News, Opinion Tagged With: Floods, Murray River, Snowy Hydro

How Much Should One Frog Eat?

December 15, 2010 By jennifer

THE green tree frog, with the white lip, that I fed last night is currently asleep outside my kitchen window.  

Last night she – I call her Emily – ate four grasshoppers, two moths, one bush cockroach, one click-beetle, but refused the squirming earthworm I held out for her.

I understand it is easy to overfed a frog.  

There are lots of grasshoppers in my veggie garden at the moment which I can easily collect during the day and keep alive in a container for Emily when she wakes up around 7pm.   But, how many should I feed her each night?  

Picture taken by Neil Hewett of a frog like Emily in the Daintree.

And please, spare me the response from the public servants – who for mostly just sitting on their bums each day get money regularly fed into their Sydney bank accounts – that Emily should actually go hunting for her own food in the wilds of the adjacent nature reserve.

Filed Under: News Tagged With: Plants and Animals

Snowy Hydro Wants Changes to Licence Provisions to Avoid Exacerbating Flooding

December 14, 2010 By jennifer

TERRY Charlton, CEO and Managing Director of Snowy Hydro, confirmed with me this morning by telephone that Snowy Hydro has been making water releases that may have exacerbated current flood conditions in the Murray Darling Basin because of licence conditions imposed by the NSW Office of Water. 

Mr Charlton told me that he wrote to the NSW government on April 21, 2010, and raised the potential issue in the licence, the requirement for Snowy Hydro to repay water immediately inflows climbed above a specified long range value.

As recently as last night, December 13, 2010, Mr Charlton was still in talks with the NSW Office of Water asking that this provision in their licence be changed.

“The NSW government appears unable to make any decisions,” said Mr Charlton.

“The situation is ridiculous.  We are frustrated.   Late last week we pulled back on the water releases but this potentially puts us in contravention of our water licence,” said Mr Charlton.

Filed Under: News Tagged With: Floods, Murray River, Snowy Hydro

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 109
  • Go to page 110
  • Go to page 111
  • Go to page 112
  • Go to page 113
  • Interim pages omitted …
  • Go to page 445
  • Go to Next Page »

Primary Sidebar

Recent Comments

  • Ian Thomson on Vax-ed as Sick as Unvax-ed, Amongst My Friends
  • Dave Ross on Vax-ed as Sick as Unvax-ed, Amongst My Friends
  • Dave Ross on Vax-ed as Sick as Unvax-ed, Amongst My Friends
  • Alex on Incarceration Nation: Frightened of Ivermectin, and Dihydrogen monoxide
  • Wilhelm Grimm III on Incarceration Nation: Frightened of Ivermectin, and Dihydrogen monoxide

Subscribe For News Updates

  • This field is for validation purposes and should be left unchanged.

November 2025
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
« Jan    

Archives

Footer

About Me

Jennifer Marohasy Jennifer Marohasy BSc PhD has worked in industry and government. She is currently researching a novel technique for long-range weather forecasting funded by the B. Macfie Family Foundation. Read more

Subscribe For News Updates

Subscribe Me

Contact Me

To get in touch with Jennifer call 0418873222 or international call +61418873222.

Email: jennifermarohasy at gmail.com

Connect With Me

  • Facebook
  • LinkedIn
  • RSS
  • Twitter
  • YouTube

Copyright © 2014 - 2018 Jennifer Marohasy. All rights reserved. | Legal

Website by 46digital